$0.00
CompTIA PK0-004 Dumps

CompTIA PK0-004 Exam Dumps

CompTIA Project +

Total Questions : 796
Update Date : November 10, 2024
PDF + Test Engine
$65 $95
Test Engine
$55 $85
PDF Only
$45 $75



Last Week PK0-004 Exam Results

271

Customers Passed CompTIA PK0-004 Exam

93%

Average Score In Real PK0-004 Exam

99%

Questions came from our PK0-004 dumps.



Choosing the Right Path for Your PK0-004 Exam Preparation

Welcome to PassExamHub's comprehensive study guide for the CompTIA Project + exam. Our PK0-004 dumps is designed to equip you with the knowledge and resources you need to confidently prepare for and succeed in the PK0-004 certification exam.

What Our CompTIA PK0-004 Study Material Offers

PassExamHub's PK0-004 dumps PDF is carefully crafted to provide you with a comprehensive and effective learning experience. Our study material includes:

In-depth Content: Our study guide covers all the key concepts, topics, and skills you need to master for the PK0-004 exam. Each topic is explained in a clear and concise manner, making it easy to understand even the most complex concepts.
Online Test Engine: Test your knowledge and build your confidence with a wide range of practice questions that simulate the actual exam format. Our test engine cover every exam objective and provide detailed explanations for both correct and incorrect answers.
Exam Strategies: Get valuable insights into exam-taking strategies, time management, and how to approach different types of questions.
Real-world Scenarios: Gain practical insights into applying your knowledge in real-world scenarios, ensuring you're well-prepared to tackle challenges in your professional career.

Why Choose PassExamHub?

Expertise: Our PK0-004 exam questions answers are developed by experienced CompTIA certified professionals who have a deep understanding of the exam objectives and industry best practices.
Comprehensive Coverage: We leave no stone unturned in covering every topic and skill that could appear on the PK0-004 exam, ensuring you're fully prepared.
Engaging Learning: Our content is presented in a user-friendly and engaging format, making your study sessions enjoyable and effective.
Proven Success: Countless students have used our study materials to achieve their PK0-004 certifications and advance their careers.
Start Your Journey Today!

Embark on your journey to CompTIA Project + success with PassExamHub. Our study material is your trusted companion in preparing for the PK0-004 exam and unlocking exciting career opportunities.

CompTIA PK0-004 Sample Question Answers

Question # 1

Upon assignment to a project, the project manager is given a set budget, a due date, and a clearly defined description of desired deliverables. Which of the following should the project manager do NEXT?

A. Determine the flexibility between the project constraints
B. Hold a kick-off meeting with the project team
C. Determine procurement needs to meet the project demands
D. Create the risk register



Question # 2

Analogous estimating was used earlier in a hauling project; however, through progressive elaboration, it is determined that the cost for fuel is much lower than anticipated. Which of the following types of project change should be submitted?

A. Resources
B. Requirements
C. Scope
D. Funding



Question # 3

A project manager has taken over a project that is already in progress. The project manager notices the functional manager of one team is unaware of the current progress. Which of the following should the project manager do? (Choose two.)

A. Update the project charter to include the functional manager as a key stakeholder
B. Publish the project schedule to the functional manager
C. Review the communications plan to ensure proper involvement
D. Add the incident to the issue log and seek resolution
E. Ensure the functional manager is on the status report distribution list



Question # 4

A hurricane occurs in an area where several key project resources are located. When reviewing the project dashboard, the project sponsor sees the project is behind schedule and asks the project manager for an explanation. Which of the following documents should the project manager examine NEXT to provide an explanation? 

A. Meeting minutes
B. Issue log
C. Project schedule
D. Budget



Question # 5

A project manager is assigned a project that is part of the company’s strategic objectives. Of which of the following is the project a part?

A. Project management office
B. Portfolio
C. Program
D. Mission statement



Question # 6

A project manager is starting a project on an unfamiliar technology. The document that is MOST likely to be created and distributed is an: 

A. RTM
B. RFQ
C. RFI
D. RFP



Question # 7

A project team is working on a project with high public visibility and excitement. The project sponsor is concerned the public may lose interest due to the long delivery timeline. Which of the following is the BEST way to keep the external stakeholders informed and engaged throughout the project?

A. Video conferencing
B. Instant messaging
C. Social media
D. Email



Question # 8

Which of the following represents the order of the team development stages? 

A. Forming, storming, norming, performing
B. Forming, performing, storming, norming
C. Forming, norming, storming, performing
D. Forming, norming, performing, storming



Question # 9

Which of the following should a project manager consider as part of a make or buy analysis? 

A. Organization type
B. KPIs
C. Project charter
D. Trade secrets



Question # 10

A project has been experiencing some difficulties due to third-party vendors. The project manager should request. 

A. Additional resources
B. A gate review
C. A risk register update
D. A performance audit



Question # 11

Which of the following are characteristics of a matrix organization? (Choose three.) 

A. The project manager has full authority.
B. Resources report directly to the functional manager.
C. Authority is shared between functional and project managers.
D. Resources are assigned from functional area to project.
E. There is ad hoc resourcing.
F. The organization utilizes a bench.
G. The project manager authority ranges from strong to weak.



Question # 12

Which of the following organizational structures uses project team members who are selected from within their department?

A. Projectized
B. Balanced matrix
C. Functional
D. Strong matrix



Question # 13

The PMO has asked the PM to provide a status report indicating the number of events and activities required to complete a project. Which of the following charts should the PM include in the status report?

A. Gantt chart
B. Scatter chart
C. Run chart
D. Process diagram



Question # 14

Which of the following is a risk strategy? 

A. Risk quantification
B. Risk avoidance
C. Risk identification
D. Risk review



Question # 15

A project sponsor approved an undocumented change without following the formal change control process. The resulting change caused an outage in a crucial accounting application. Which of the following change control processes would help mitigate the realization of this risk?

A. Regression plan
B. Quality plan
C. Change validation
D. Application version control



Question # 16

A key team member found a new job and will be leaving in two weeks. Which of the following should the project manager do FIRST to minimize negative impacts to the project?

A. Request a replacement from the project sponsor.
B. Contact human resources to initiate the termination process.
C. Involve the legal department for contract review.
D. Inform executive management about attrition.



Question # 17

A key stakeholder claims to have not received status updates per the agreement. The PM reviews the communications plan and determines the updates were provided as agreed upon. Which of the following should the PM do NEXT to resolve the inconsistency between the communications plan and the stakeholder’s expectations?

A. Analyze the RASI chart
B. Review previous meeting minutes.
C. Initiate a change control request.
D. Updates the communications plan.



Question # 18

Which of the following are the components of a RACI matrix? 

A. Responsibility, authority, support, inform
B. Responsible, accountable, consulted, informed
C. Reliability, accountability, support, inform
D. Responsibility, acquired, consulted, informed



Question # 19

The supervisor asks an engineer to be a project manager within the department. Of which of the following types of organizational structures is this an example? 

A. Projectized
B. Functional
C. Matrix
D. Intermediary



Question # 20

A PM has a complex project that requires coordination among numerous stakeholders. Which of the following is the MOST appropriate type of meeting for the stakeholders to hold?

A. Virtual
B. Impromptu
C. One-on-one
D. In-person



Question # 21

A client has requested a project be completed ahead of schedule. The client understands the triple constraints and agrees to expand the defect tolerance.Which of the following should the PM do NEXT?  

A. Crash the schedule
B. Notify the project team.
C. Initiate a change request
D. Accept the risk.



Question # 22

Which of the following is the MOST important component against which the project manager can analyze project performance?

A. Burn rate
B. Project baselines
C. KPIs
D. Budget



Question # 23

Which of the following organization types requires the project manager to report performance issues to another department?

A. Functional
B. Strong matrix
C. Projectized
D. Weak matrix



Question # 24

A developer is experiencing constant project scope changes and reaches out to the project manager to discuss the situation. They agree the customer has requested multiple modifications to the core idea and now extra work may need to be performed. Which of the following approaches would BEST support on-time delivery considering these changes?

A. Strict change management controls
B. Regular Scrum meetings
C. Continuous requirements gathering
D. Regular milestone reviews



Question # 25

Due to a lack of adherence to the risk response plan, there are numerous safety concerns within the scope of a building project. Which of the following MOST likely explains this issue?

A. Risks were not identified.
B. Risks were not mitigated.
C. Risks were not exploited.
D. Risks were not communicated.



Question # 26

A project manager notices a lack of meeting attendance from the project team. Which of the following actions might the project manager take to BEST improve the level of attendance?

A. Schedule the meeting directly on the attendees’ calendars.
B. Publish an agenda prior to the meeting.
C. Increase the number of email invitations for the upcoming meeting.
D. Send the meeting invitation by email with a read receipt.



Question # 27

A project team has just finished one phase of product development and is gathering requirements for the next phase. Which of the following methodologies is being applied?

A. Waterfall
B. PRINCE2
C. Agile
D. Top-down



Question # 28

Team members in a projectized organization are released at the end of a project and placed on the “bench”. Which of the following should the benched team members do NEXT?

A. Find a new project.
B .Check in with a functional manager.
C. Report to the project manager.
D. Contact the project sponsor.



Question # 29

Which of the following resources outlines consequences of non-performance? 

A. Project sponsor
B. Project team
C. Customer
D. Project management office



Question # 30

Which of the following tasks are responsibilities of the project manager role?

A. Provide inputs, estimate tasks, and manage a team
B. Manage the budget, perform quality assurance, and be accountable for artifacts
C. Set deliverables, control risk, manage risk, and create a project charter
D. Manage a team, marketing, roadblocks, and project steering



Question # 31

A project task has been completed ahead of schedule. Which of the following is the MOST appropriate next step?

A. Provide the next task to the newly freed resource.
B. Communicate the success to the team.
C. Notify the project sponsor of the new completion date.
D. Update the schedule and add lag to the next task.



Question # 32

An organization is divided into three separate entities based on geographical region. Which of the following types of organizational change is this?

A. Relocation
B. Outsourcing
C. Demerger
D. Split



Question # 33

When developing a project schedule, which of the following resources is the BEST to estimate task duration? 

A. Project manager
B. Project scheduler
C. Project team
D. Project sponsor



Question # 34

During a risk review session, the project team identified the percentage probability that a particular risk will occur. This is known as:

A. risk identification
B. risk prioritization
C. risk qualification
D. risk quantification



Question # 35

Which of the following can a project manager use to keep track of finances and ensure costs are accurately applied to a project?

A. PO numbers
B. Cost baseline
C. Bill of materials
D. WBS codes



Question # 36

A new project manager is working in an environment where resources report to another supervisor. The project manager is having difficulty with a particular member and wants to escalate the issue. Which of the following documents should the project manager consult? 

A. Issue log
B. RACI chart
C. Risk management plan
D. Organizational chart



Question # 37

Which of the following will identify the MOST potential project risks? 

A. Cost-benefit analysis
B. Past project documentation
C. Project budget
D. Benchmarking



Question # 38

A project team is spread between two countries on different continents. Which of the following factors are MOST likely to influence communication methods selected for the communication plan? (Select TWO).

A. Interorganizational constraints
B. Personal preferences
C. Language barriers
D. Cultural differences
E. Confidentiality constraints



Question # 39

An engineer is troubleshooting a malfunctioning physical deliverable and requires assistance from remote team members. Which of the following would be the BEST communication method for the engineer to use?

A. Phone conversation
B. Face-to-face meeting
C. Instant messaging
D. Video conference



Question # 40

A key stakeholder asked several members of the project team to make project changes without submitting them for approval. Because the stakeholder is related to the Chief Executive Officer (CEO), the team members are reluctant to deny these requests. Which of the following should the project manager do FIRST to control this situation?

A. Have the team members deny all change requests from this stakeholder
B. Ask the project sponsor for more funding to anticipate the change requests from the key stakeholder
C. Contact the key stakeholder to encourage the submission of written change requests
D. Request additional resources from the project team to complete the change requests from the key stakeholder



Question # 41

A part that is needed to complete Task 3 has been backordered and will arrive three days later than scheduled. Task 3 must be complete for Task 4 to start. There is one day of float for the two tasks. Which of the following represents the number of days the project schedule will be delayed?

A. Zero
B. One
C. Two
D. Three



Question # 42

A project manager is performing resource leveling and notices one of the functional testers is assigned 40% in a second project. The project manager needs the resource to be 100% dedicated to the project; otherwise, the testing phase jeopardizes the delivery date. Which of the following should the project manager do NEXT?

A. Ask the resource manager to deallocate the resource from the second project.
B. Ask the resource manager to assign a new resource with 40% of allocation.
C. Keep the resource 100% allocated in the project, as per the initial plan.
D. Change the resource to 60% of allocation and review the mitigation plan.



Question # 43

A project can be defined as: 

A. permanent and ongoing.
B. temporary and unique.
C. temporary and standard.
D. permanent and unique.



Question # 44

A project sponsor wants to know which tasks are next in the project but is unable to find this information. Which of the following may need to be adjusted?

A. Scope document
B. Status report
C. Issue log
D. Risk log



Question # 45

Which of the following charts would indicate the cause and effect of tasks in a project, and for which of the following activities would the chart be used?

A. Histogram, forecasting
B. Ishikawa, quality control
C. Scatter, determining resources
D. Gantt, leveraging resources



Question # 46

Which of the following are major characteristics of sprint planning? (Choose two.) 

A. Defining the sprint durations
B. Defining the sprint owners
C. Defining the sprint parameters
D. Defining the number of sprints
E. Defining the sprint classifications



Question # 47

While planning a project, the project team estimates known expenses but also applies a margin of error for unknown expenses. Which of the following is the project team trying to determine?

A. Cost of quality
B. Expenditures
C. Total project cost
D. Burn rate



Question # 48

A member of a CCB notices a change request was not approved by the steering committee. Which of the following is the BEST method to handle this situation? 

A. Disapprove the change request.
B. Evaluate the impact of the change.
C. Develop a regression plan.
D. Hold the change request for review



Question # 49

The project team has identified all the tasks needed to create project deliverables and grouped them into work packages covering all project scope. Which of the following should be done NEXT? 

A. Identify task relationships.
B. Put the resources on tasks.
C. Set the quality gates.
D. Estimate the work package.



Question # 50

Which of the following includes setting governance gates as well as predecessors and dependencies? 

A. Project communication
B. Project constraints
C. Project change control
D. Project scheduling



Question # 51

In the review of a project status report, the slack is negative. Which of the following should the project manager tell the stakeholders?

A. The project is behind schedule
B. The project is over budget
C. The project has float available
D. The project needs a gate review



Question # 52

A construction company is building a plant in a territory that is prone to earthquakes. To address the risk and consequences of potential earthquakes during and after plant construction, the company purchases additional insurance. Which of the following risk responses has occurred?

A. Avoiding
B. Mitigating
C. Accepting
D. Transferring



Question # 53

A new executive has joined the organization and is considering adding deliverables to the scope. The sponsor agrees with the executive but does not want to change the completion date. Which of the following options would be MOST useful to the project manager to accommodate the new scope without extending the completion date? (Choose two.)

A. Fast-track some tasks to free up time.
B. Remove some of the previous deliverables.
C. Document the impact to the scope.
D. Request additional funds to get more resources.
E. Deny the scope change.
F. Perform regression analysis on the changes.



Question # 54

A company recently discovered that it could save money by moving its call center to another country. The company entered into an agreement for call center services. Which of the following types of organizational change is this? 

A. Relocation
B. Outsourcing
C. Business process change
D. Business demerger/split



Question # 55

A project manager has updated the project schedule but cannot analyze the schedule performance. Which of the following steps did the project manager miss?

A. Lock the schedule
B. Approve the schedule
C. Baseline the schedule
D. Fast track the schedule



Question # 56

According to the communication management plan, the project scheduler is required to post weekly status reports on the project’s intranet site. From the stakeholders’ point of view, accessing the weekly report is an example of:

A. interorganizational preferences
B. personal preferences
C. the interactive method
D. the pull method



Question # 57

A project manager is reviewing project performance. Which of the following would be the BEST indicator of the total project cost?

A. AC
B. EAC
C. CPI
D. ETC



Question # 58

Task A starts on Day 1 and has a duration of two days. Task B has a duration of two days and starts on Day 3. Task C starts after Task A and has a duration of three days. Task D starts after Task B and Task C and has a duration of one day. Which of the following represents the critical path?

A. Five days
B. Six days
C. Seven days
D. Eight days



Question # 59

Which of the following conflict resolution techniques relies on establishing areas of agreement rather than disagreement?

A. Smoothing
B. Collaborating
C. Compromising
D. Avoiding



Question # 60

A company just announced all third-party vendors must provide ten cybersecurity resources within six weeks. Which of the following documents should the project manager create LAST? 

A. RFI
B. NDA
C. MOU
D. RFQ



Question # 61

The government wants to start a project that will launch a satellite but lacks the appropriate SMEs. Which of the following would be BEST to solicit vendors?

A. LOI
B. RFQ
C. RFI
D. SOW



Question # 62

The PM has requested that a project repository be developed. Sensitive information will be available on the site that could affect the project’s success. Only personnel who need to know the information will have access. Which of the following site types is the PM requesting?

A. Wiki page
B. Intranet
C. Extranet
D. Internet
E. Knowledge base



Question # 63

Company A and Company B have come together to form a new Company C. Staff members from both companies have been moved to Company C, and there are rumors that some staff might be asked to leave. These are examples of: (Choose two.)

A. business reorganization
B. business relocation
C. business outsourcing
D. business merger
E. business process change



Question # 64

A project manager, who previously worked at a construction firm, has just joined an IT organization and has been assigned to handle a security project. Which of the following roles can provide technical direction during the course of the project?

A. Security SME
B. Business analyst
C. Project scheduler
D. Project sponsor



Question # 65

Which of the following events would MOST likely merit immediate communication to all project stakeholders? (Choose two.)

A. Business continuity response
B. Milestone achievement
C. Incident response
D. Schedule change
E. Change request
F. Stakeholder changes



Question # 66

A project manager determines deliverables are not meeting customer specifications. During which of the following project phases is this determination MOST likely to happen?

A. Monitor and control
B. Execution
C. Closing
D. Planning



Question # 67

Which of the following job roles is MOST responsible for providing input on the project requirements, steering the project, providing expertise, and having vested interest in the project?

A. Project scheduler
B. Project stakeholder
C. Project team
D. Project coordinator



Question # 68

A customer is in the early planning stages of a technology rebuild. To gain a better understanding of the possible solutions, which of the following documents should the customer send to prospective vendors?

A. RFP
B. RFQ
C. RFI
D. SOW



Question # 69

A project manager is assigned to a project that was previously managed by a peer project manager. The project manager identifies several modifications that were deployed prior to CCB approval. Which of the following change control processes is being mismanaged?

A. Change validation with quality checks
B. Regression planning
C. Identify approval authority
D. Change implementation



Question # 70

While preparing to plan a project, the project manager meets with the key stakeholders to determine the flexibility between the project constraints. Which of the following techniques should the project manager consider to reduce personal bias and increase buy-in? 

A. Send the stakeholders a survey about the project constraints to complete anonymously
B. Watch and determine which constraint is most important
C. Compare the constraints two at a time and have the stakeholders vote on importance
D. Look at historical information regarding the flexibility preferences of key stakeholders



Question # 71

Which of the following network scheduling techniques is focused mainly on the duration and stack of each activity?

A. Program evaluation review technique
B. Precedence diagramming method
C. Arrow diagramming metho
D. Critical path method



Question # 72

Language barriers will MOST likely influence a PM to: 

A. use more print media to communicate with the stakeholders.
B. hire a bilingual project team that is fluent in the language to reduce conflict.
C. hire an interpreter to ensure verbal and written communications are accurate.
D. learn the unknown language to be able to communicate effectively with stakeholders.



Question # 73

A project is running behind schedule. To meet the delivery timelines, the project manager decides to give part of the work to another organization for quicker delivery and to allow the project team to focus on the remaining tasks. This is an example of:

A. crashing.
B. outsourcing.
C. task reassignment.
D. relocation.



Question # 74

An active construction project must make immediate changes when it is discovered that the designated project area contains protected wetlands. Which of the following is the MOST likely impact to the project?

A. The project quality will decrease
B. The project scope will decrease
C. The project timeline will increase
D. The interproject dependencies will increase



Question # 75

A company purchased a parachute supplier and is now sending parachutes to the research and development department. Which of the following has occurred? 

A. Risk avoidance
B. Outsourcing
C. Business demerger
D. Business acquisition



Question # 76

Which of the following describes a project’s budget overrun? 

A. The project spends only half of the funds.
B. The project spends only the allocated funds.
C. The project spends none of the funds.
D. The project spends in excess of the funds.



Question # 77

A project manager is planning to hold a meeting to discuss what went well, what did not go well, and what should be done differently. Which of the following meetings should the project manager hold? 

A. Kickoff
C. Impromptu
C. Closure
D. Status



Question # 78

A project manager noted there were many possible features that could be incorporated into a project, and the customers wavered about whether to include particular features. Which of the following is the BEST approach to ensure appropriate delivery of the project?

A. In one section of the project charter, specify which features are included in the project, in another section, specify which features are not included in the project
B. The scope statement should enumerate which features are included in the project and which features are not included in the project.
C. At the beginning and end of every meeting, the project manager should consistently remind the project team which features are included in the project and which features are not included in the project.
D. The project requirements document lists all the features that are included in the project, and the project manager diligently ensures that features not included in the project are not included in the MOU with the customer.



Question # 79

The project team is moving from high-level risks to detailed risks. Which of the following project phases is the project team moving between?

A. Execution to monitor and control
B. Initiation to planning
C. Initiation to monitor and control
D. Planning to execution



Question # 80

Which of the following documents will provide the MOST detailed information regarding the work a vendor will perform during a project?

A. RFI
B. SLA
C. SOW
D. PO